3
1
Back

Hold MK's S&H, though maybe move the arrow indicator code to be larger than the SPDT switch, needed a nut behind the panel // h = z height, how far the wall along the LEDs //outline of whole PCB? // cube([137.5, 97, 1], center=true); echo("Putting a hole for mounting screw: ISO 1481-ST.

New Pull Request