Labels Milestones
Back2a5bb74bbd Go to file 2cbdb94ba9 updated C5 footprint & tracing; schematic annotation updates the potentiometer pads and trace routing to de-bodge the pots. 's notes on updating the fireball for rev 2 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV lines? **UI.
- Vertex -9.322199e+01 9.303533e+01 1.855000e+01 vertex -9.023681e+01 9.809614e+01.
- Socket 20-lead though-hole mounted DIP package, row spacing.
- // 'x' of 20 degree rotation.
- 9.665134e+01 8.826184e+00 vertex -1.068524e+02 9.665134e+01 8.826184e+00 vertex.
- -6.787200e-14 facet normal 8.379959e-001 5.456765e-001 -0.000000e+000 vertex.