3
1
Back

A CV in to pause the sequence. Probably can't do, or impractical: CV-controlled clock. Presumably the CV in to pause the clock feature/seq_chaining Checkpoint before trying to add picture 53c90c58d81dff355f8b17948a9b73c895233eb2 Add notes about UX component wiring initial notes for other changes requested

  • Change page size to 9mm and align it precisely for repeatability d6ebbf1c1b Collect other files not yet included in MIT License Copyright (c) 2015, Nicholas Waples Copyright (C) 2017 Alec Thomas Permission is hereby granted, free of charge, to.

    New Pull Request