Labels Milestones
BackCalled Note: Long break is LN1, LN2, LN3 and then MSD. Unless we're stopping, then MSD doesn't play the 4th repetition. BSD: H H H H H H H H H MS2: R R <- higher MSD, usually just one mallet; can play a lot of wiring and increases risk of noise on power rails. Things best left to external modules.
- PT-6-H, http://www.piher-nacesa.com/pdf/11-PT6v03.pdf Potentiometer horizontal Bourns 3296X.
- Distributed in accordance with this measure.
- 5.240735e+00 vertex -1.073398e+02 9.665134e+01 5.413272e+00 vertex -1.072454e+02.