3
1
Back

To 16-pin cable when nothing is plugged into CLOCK. Could replace step IDs with a nut behind the front panel. Possibly do as an edge cut? Corrected in Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV on the mid surdos.

Examples