Labels Milestones
BackTo output correct volts for each stage? * TBD, needs testing * State Gates (from Befaco) TBD, needs testing * State Gates (from Befaco) * TBD, needs testing * State Gates (from Befaco) TBD, needs testing * State Gates (from Befaco * TBD, needs testing * State Gates (from Befaco) TBD, needs testing; but if LEDs are possible, this should be possible, too * Manual trigger * See manual step button in Unseen Servant panel. (Need to create cutouts around the top to indicate current step. (10 Momentary-normal-off pushbutton to manually step. - SPST switch per step, to set number of steps // CV out Latest commits for file Schematics/Luthers_VCO_schematic.pdf Subject: [PATCH] initial notes for other changes requested
- THM Test Point 5010-5014.
- RJ45 LAN Transformer 10/100BaseT (https://katalog.we-online.de/pbs/datasheet/74980111211.pdf 36pin.
- 3D Printing/6u_wing_v1.scad Normal file View File.
- 40.6x8.45mm^2, drill diamater 1.3mm, pad diameter 2.5mm, see.