3
1
Back

For: MCV_1,5/15-GF-3.5; number of markings on the left sub-panel right_rib_x = width_mm - thickness; left_panel_spacing = (left_panel_width) / 2.5; slider_spacing = 12.5; // space between two resistors Properly assign potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV routing f12031bb4117bdc0bfa93734f5e1f978a14297b0 edits README.md file edits README.md file adds README.md file again edits README.md file again 605f29538db81c6c2eb02428332e653ea5ee7e41 edits README.md file 4f6e9e0984 Updated LICD, alter alt-textify to handle weaker (<6v) signals - Clock Rate - variable resist +6k between U2-8 and U2-9 Reset Sw - when two traces cross on opposite sides of the hole for mounting screw: ISO 1481-ST 2.2x6.5 C or ISO 7049-ST 2.2x6.5 C (http://www.fasteners.eu/standards/ISO/7049/) || order number: 1830648 8A 160V Generic.

New Pull Request