Labels Milestones
BackRev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on updating the fireball for rev 2 beta README.md | 8 | 1N4148 | Standard switching diode, DO-35"/>
Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on updating the fireball for rev 2 beta README.md | 8 | 1N4148 | Standard switching diode, DO-35"/>