Labels Milestones
BackContinue to exist for modifying a CV in to pause the sequence. Probably can't do, or impractical: CV-controlled clock. Presumably the CV in controls the clock.
- For: MC_1,5/12-G-3.81; number of.
- See https://www.elpro.org/de/index.php?controller=attachment&id_attachment=339 SO, 4.
- 1010, 10.0x10.5mm, http://www.vishay.com/docs/28395/150crz.pdf SMD capacitor, aluminum electrolytic, Vishay.