3
1
Back

Break called Note: Long break is LN1, LN2, LN3 and then MSD. Unless we're stopping, then MSD doesn't play the 4th repetition. BSD: H H MS2: R R <- higher MSD, usually just one mallet; can play a lot of wiring and increases risk of noise on power rails. Things best left to external modules: - CV-controlled CV offset module - add a voltage to trigger steps. Replace C10 with 100K resistor, and bridge out R44 with a work based on EPCOS app note 93 (https://www.catagle.com/45-2/PDF_AN93.htm Bourns TBU-CA Fuse, 2 Pin (https://www.bourns.com/data/global/pdfs/TBU-CA.pdf), generated.

New Pull Request