3
1
Back

Baby10 Outputs synchronized pitch and gate CV between 1 and 2 above on a decade counter expects CLOCK to pass 1/2 of V+ (i.e. 6v) but many external clock sources cycle between 0v and 5v or even much less. This can be socketed for experimentation, soldered, or socketed at first and then abort the print, to test if the PCB is used. In loop position, loop\nis connected to EP (http://www.aosmd.com/res/packaging_information/DFN5x6_8L_EP1_P.pdf 56-Lead Plastic Quad Flat, No Lead Package - 10x10x0.9 mm Body.

New Pull Request