Labels Milestones
BackPanels/FireballSpell.dxf 99b8f1493d Go to file 6523065365 updates the potentiometer pads and trace routing to de-bodge the pots. 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV routing Synth Mages.
- (http://www.st.com/resource/en/datasheet/lsm303dlhc.pdf), generated with kicad-footprint-generator.
- -3.997110e+000 2.491820e+001 facet normal 0.0331891 -0.780252.