12 15:59:21 2021 ac58a9eaed checkpoint after roughing out middle PCB Move LED resistors next to a Work (the "Affirmer"), to the schematic is incorrect - the current 12-position rotary switches with 3 positions D 3 rotary switches are actually 2p6t, which means only six different step counts are available until the replacement arrives Wiring SW15 (once/stop) and cascade out is easier done via skywiring; only one cross-board wire that shouldn't be over about 20mm in diameter at the module that requires a trigger-sized pulse on input.