3
1
Back

Strip, HLE-111-02-xxx-DV-LC, 11 Pins per row (https://www.hirose.com/product/document?clcode=CL0537-0694-9-81&productname=DF12C(3.0)-50DS-0.5V(81)&series=DF12&documenttype=2DDrawing&lang=en&documentid=0000994748), generated with kicad-footprint-generator Soldered wire connection, for a single 1 mm² wire, basic insulation, conductor diameter 1.7mm, outer diameter 3.6mm, size source Multi-Contact FLEXI-E 0.75 (https://ec.staubli.com/AcroFiles/Catalogues/TM_Cab-Main-11014119_(en)_hi.pdf), bend radius 3 times outer diameter, generated with kicad-footprint-generator Mounting Hardware, inside through hole 4.5mm, height 10, Wuerth electronics 9774025960.

New Pull Request