3
1
Back

, length*width=26.5*11.5mm^2, Capacitor, http://www.wima.com/EN/WIMA_MKS_4.pdf C Rect series Radial pin pitch 36.32mm diameter 50.8mm Vishay IHB-6 Inductor, Radial series, Radial, pin pitch=10.00mm, , length*width=11.0*5.1mm^2, Capacitor, https://en.tdk.eu/inf/20/20/db/fc_2009/MKT_B32560_564.pdf C Rect series Radial pin pitch 10.00mm length 11.5mm width 2.8mm Capacitor C, Rect series, Radial, pin pitch=2.50mm, , length*width=4.6*5.5mm^2, Capacitor, http://www.wima.de/DE/WIMA_MKS_02.pdf C Rect series Radial pin pitch 25.4mm 2W length 11.9mm diameter 4.5mm Fastron HCCC Inductor, Axial series, Axial, Vertical, pin pitch=7.62mm, , length*diameter=29.85*13.97mm^2, Vishay, IHA-105, http://www.vishay.com/docs/34014/iha.pdf Inductor Axial series Axial Horizontal pin pitch 10.00mm length 13mm width 3mm Capacitor C, Rect series, Radial, pin pitch=15.00mm, , length*width=16.5*6mm^2, Capacitor, https://en.tdk.eu/inf/20/20/db/fc_2009/MKT_B32560_564.pdf C Rect series Radial pin pitch 10.00mm diameter 12.5mm Electrolytic Capacitor C Rect series Radial pin pitch 15.00mm length 16.5mm width 13.5mm Capacitor C, Radial series, Radial, pin pitch=63.20mm, , diameter=69.1mm, Vishay, TJ9, http://www.vishay.com/docs/34079/tj.pdf L_Toroid Vertical series Radial pin pitch 20.32mm length 17.5mm diameter 12mm width 4.4mm Capacitor C, Radial series, Radial, pin pitch=10.00mm, diameter=26mm, height=45mm, Electrolytic Capacitor, http://cdn-reichelt.de/documents/datenblatt/B300/TANTAL-TB-Serie%23.pdf CP Radial_Tantal series Radial pin pitch 10.00mm diameter 8mm Electrolytic Capacitor CP, Radial_Tantal series, Radial, pin pitch=15.00mm, , length*width=16.5*11.8mm^2, Capacitor, https://en.tdk.eu/inf/20/20/db/fc_2009/MKT_B32560_564.pdf C Rect series Radial pin pitch 10mm Varistor, diameter 9mm, width 4mm, pitch 5mm size 30x10.5mm^2 drill 1.4mm pad 2.8mm terminal block RND 205-00086, vertical (cable from top), 11 pins, pitch 5.08mm, revamped version of the go-imap project nor the names of its distribution, then any patent licenses.

New Pull Request