Labels Milestones
BackRev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV on the mid surdos.
Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV on the mid surdos.