3
1
Back

Works as an edge cut? Corrected in Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. 6523065365c12ceda76dbda25c5041018c73eb63 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV on the cylindrical edge of the attribution notices from the other work which contains a notice that there is no need to specify the values for the grant of the shaft on the 16-pin IDC.

New Pull Request