3
1
Back

About UX component wiring 55ee65a5e9 Checkpoint after converting most things to SMD Checkpoint after tweaking footprints some more, starting over at 14hp PCB initial layout, no traces "other_line_width": 0.15, PCB initial layout, no traces One SPST switch to disable reset (run once). - Momentary-normal-off pushbutton to manually reset. LEDs: One per step, to enable/disable gate per step. (10 - One potentiometer for internal clock rate. Switches: One SPST switch per step, to set output voltages. (10 - One potentiometer for internal clock rate. Arrasta Playbook REP: repique CAX: caixa MSD: mid surdo (sometimes MS1, MS2, etc, if pattern spans measures or has planned variations) BSD: back surdo (L for low, H for high R/L: Accented Note (right/left hand suggested)

r/l
Quieter, unaccented note
*
A trill, generally three very fast notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV routing updates.

New Pull Request