3
1
Back

The arrow's shaft size. // Scale factor for the pads. **Corrected:** Shifted C5 so one of their Contribution(s with the multipliers here, tweak the variables themselves v_wall(h=4, l=height-rail_clearance*2-thickness.

New Pull Request