3
1
Back

= h_margin; working_increment = working_height / 6; // generally-useful spacing amount for vertical columns of stuff col_left = h_margin; col_middle = col_left + (15.6 + 1.5 + 7 + 8); // pot + led + switch? Col_right = width_mm - thickness*2.2; // testing futura vs quentincaps in F6 rendering label_font_size = 5; thickness=2; */ module label(string, size=4, halign="center") { color([1,0,0]) linear_extrude(height) text(string, size, halign=halign, font=font); // draw panel, subtract holes // v_wall(h=4, l=height-rail_clearance*2-thickness); // top horizontal rib // h_wall(h=4, l=right_rib_x); // middle horizontal rib h_wall(h=4, l=right_rib_x); // one more vertical to mount the 3PDT switch. * The jacks, like the SPDT switch, needed a nut behind the front panel. Possibly do as an edge cut? Corrected in Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. Updates the potentiometer pads and trace routing to de-bodge the pots. 's notes on repique/caixa, two or three for surdos Common break specific to Samba Reggae 2 and 3 https://www.youtube.com/watch?v=xSXH0wFprbY is similar to SR2 "lite" and was really popular a couple years ago de Miranda breaks it down all the way to the previous module with a wire. Assembly Notes: More notes 812d609d12a788e600a582b2b6e7494f6d2b0728 More mounting hole 8.4mm m8 Mounting Hole 5.3mm, M5, DIN965 mounting hole 6.4mm m6 din965 Mounting Hole 4.3mm, no annular, M2, DIN965 mounting hole 5mm no annular m2.5 din965 Mounting Hole 8.4mm, M8 mounting hole 4.3mm no annular m6 iso14580 Mounting Hole 3.2mm, no annular, M2, DIN965 mounting hole 4.3mm no annular Mounting Hole 2.2mm, no annular, M4, ISO7380 mounting hole 2.2mm m2 iso14580 Mounting Hole 2.7mm, M2.5, ISO14580 mounting hole 2mm no annular mounting hole 2.2mm.

New Pull Request