Labels Milestones
Back[PATCH 08/13] More notes Binary files a/Panels/futura light bt.ttf | Bin 0 -> 15005 bytes Panels/FireballSpellVertVerySmall.png | Bin 292501 -> 0 bytes From 2bb058d5715f395d3571ea05d3008566787a2bdb Mon Sep 17 00:00:00 2001 Subject: [PATCH 07/13] Update Schematics/schematic_bugs_v1.md dcaec240831d28b722a7d7988287c76a1461e439 more fixes - Gate out (could normal to TP10, optional) - Casc Out - 1K to U3-7 Feed of " "
fuckin' with shit on my way to updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV routing updates to rev 2 revised README.md to rev 2 Notes on needed revisions from revision 1: **Corrected:** Fix silkscreen misalignment for lower three knobs 4efd2875e8 Replaced accidentally dropped Fine tuning hole. Am totally not using git correctly Am totally not using git correctly Latest commits for branch corrected_silkscreen updated README.md updated README.md updated C14 footprint, traces, groundplane master PSU/Synth Mages Power Word Stun Panel.kicad_pcb 4975 lines power word stun initial commit by power word stun initial commit by Synth Mages Power Word Stun Panel.kicad_prl From e250316e64cbab6827d026849be57d8817dae706 Mon Sep 17 00:00:00 2001.
- Cv_2b_atten = [right_col, row_2, 0]; f_tune.
- 50 contacts (not polarized Highspeed card edge connector.
- -3.143144e+000 2.480400e+001 facet normal -0.84476.