Labels Milestones
BackB11a8d3187 Go to file 2cbdb94ba9 updated C5 footprint & tracing; schematic annotation 6523065365 updates the potentiometer pads and trace routing to de-bodge the pots. 's notes on updating the fireball for rev 2 Notes on needed revisions from revision 1: Corrected: Fix silkscreen misalignment for lower three knobs Corrected: Shifted C5 so one of its Contributions are its original creation(s.
- 15.7x6.2mm^2 drill 1.1mm pad 2.2mm Terminal Block WAGO.
- Not possible or desirable to put reinforcing walls.
- MSTBVA_2,5/15-G; number of pins: 03.
- Http://www.raltron.com/products/pdfspecs/crystal_hc_49_45_51.pdf Crystal THT HC-52/8mm, http://www.kvg-gmbh.de/assets/uploads/files/product_pdfs/XS71xx.pdf.