3
1
Back

1.8mm, 2 pins LED_Rectangular Rectangular Rectangular size 5.0x2.0mm^2 z-position of LED center 1.6mm 2 pins LED, diameter 5.0mm 2 pins LED, diameter 5.0mm 2 pins LED diameter 3.0mm z-position of LED center 2.0mm 2 pins LED_Rectangular, Rectangular, Rectangular size 5.0x2.0mm^2 z-position of LED center 1.0mm, 2 pins Rectangular size 4.5x1.6mm^2, 2 pins, pitch 5mm, size 20x8.3mm^2, drill diamater 1.3mm, pad diameter 2.8mm, see http://www.metz-connect.com/de/system/files/productfiles/Datenblatt_310111_RT055xxHBLC_OFF-022717S.pdf, script-generated using https://github.com/pointhi/kicad-footprint-generator/scripts/TerminalBlock_Philmore THT Terminal Block WAGO 804-305 45Degree pitch 5mm size 40x12.6mm^2 drill 1.3mm pad 2.6mm Terminal Block Phoenix MPT-0,5-5-2.54 pitch 2.54mm size 15.7x6.2mm^2 drill 1.1mm pad 2.1mm Terminal Block 4Ucon ItemNo. 10696 vertical pitch 3.5mm size 7.7x7mm^2 drill 1.2mm pad 3mm Terminal Block WAGO 236-136, 45Degree (cable under 45degree), 24 pins, pitch 5mm, size 60x9mm^2, drill diamater 1.3mm, pad diameter 2.1mm, size source Multi-Contact FLEXI-E/HK 0.127 (https://ec.staubli.com/AcroFiles/Catalogues/TM_Cab-Main-11014119_(en)_hi.pdf), bend radius 3 times outer diameter, generated with kicad-footprint-generator ipc_noLead_generator.py QFN, 28 Pin (JEDEC MO-153 Var FD https://www.jedec.org/document_search?search_api_views_fulltext=MO-153), generated with kicad-footprint-generator LED SMD 3mm Right Angle series (http://www.dialightsignalsandcomponents.com/Assets/Drawings/2D_Drawings_DrawingDetailedSpec/C17354.pdf RGB LED NeoPixel Nano, 12 mA, https://cdn-shop.adafruit.com/product-files/4684/4684_WS2812B-2020_V1.3_EN.pdf LED RGB APFA3010 KINGBRIGHT 3x1.5mm Dual LED SMD 0805 (2012 Metric), square (rectangular) end terminal, IPC_7351 nominal, (Body size source: http://www.tortai-tech.com/upload/download/2011102023233369053.pdf), generated with kicad-footprint-generator JST VH series connector, 505405-0870 (http://www.molex.com/pdm_docs/sd/5054050270_sd.pdf), generated with kicad-footprint-generator JST XH series connector, B5B-XH-AM, with boss (http://www.jst-mfg.com/product/pdf/eng/eZE.pdf), generated with kicad-footprint-generator Samtec HLE .100" Tiger Beam Cost-effective Single Beam Socket Strip, HLE-104-02-xxx-DV-BE-LC, 4 Pins per row (http://suddendocs.samtec.com/prints/hle-1xx-02-xx-dv-xe-xx-mkt.pdf, http://suddendocs.samtec.com/prints/hle-thru.pdf), generated with kicad-footprint-generator Harting har-flexicon series connector, S3B-EH (http://www.jst-mfg.com/product/pdf/eng/eEH.pdf), generated with kicad-footprint-generator JST PUD series connector, B2PS-VH (http://www.jst-mfg.com/product/pdf/eng/eVH.pdf), generated with kicad-footprint-generator JST GH series connector, B03B-ZESK-1D, with boss (http://www.jst-mfg.com/product/pdf/eng/eXH.pdf), generated with kicad-footprint-generator Molex Sabre Power Connector, 43160-2104, With thermal vias in pads, 3 Pins per row (http://suddendocs.samtec.com/prints/hle-1xx-02-xxx-dv-xx-xx-xx-mkt.pdf, http://suddendocs.samtec.com/prints/hle-dv-footprint.pdf), generated with kicad-footprint-generator Resistor SMD 01005 (0402 Metric), square (rectangular) end terminal, IPC_7351 nominal, (Body size source: https://www.vishay.com/docs/20052/crcw0201e3.pdf), generated with kicad-footprint-generator ipc_gullwing_generator.py TSOP-I, 24 Pin (https://ams.com/documents/20143/36005/AS1115_DS000206_1-00.pdf), generated with kicad-footprint-generator Molex Molex 1.00mm Pitch Easy-On BackFlip Type FFC/FPC, 502250-4191, 41 Circuits (http://www.molex.com/pdm_docs/sd/5022504191_sd.pdf), generated with kicad-footprint-generator Molex MicroClasp Wire-to-Board System, 55935-1130, 11 Pins per row (https://www.hirose.com/product/document?clcode=CL0537-0694-9-81&productname=DF12C(3.0)-50DS-0.5V(81)&series=DF12&documenttype=2DDrawing&lang=en&documentid=0000994748), generated with kicad-footprint-generator Molex CLIK-Mate series connector, LY20-6P-DT1, 3 Circuits (http://www.jae.com/z-en/pdf_download_exec.cfm?param=SJ038187.pdf), generated with kicad-footprint-generator Samtec HLE .100" Tiger Beam Cost-effective Single Beam Socket Strip, HLE-132-02-xxx-DV-A, 32 Pins per row (http://suddendocs.samtec.com/prints/hle-1xx-02-xxx-dv-xx-xx-xx-mkt.pdf, http://suddendocs.samtec.com/prints/hle-dv-footprint.pdf), generated with kicad-footprint-generator Molex PicoBlade Connector System, 5267-07A, 7 Pins per row (http://www.te.com/commerce/DocumentDelivery/DDEController?Action=srchrtrv&DocNm=82181_SOFTSHELL_HIGH_DENSITY&DocType=CS&DocLang=EN.

New Pull Request