3
1
Back

In Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. Updates the potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on updating the fireball for rev 2 beta d89db83df13552281151487e636d3175f5aa0e7b updates to rev 2 beta by adding +5V, and both trigger/gate and CV on the thru-holes. - Move any UX connections on the.

New Pull Request