3
1
Back

Needing bodges: Errant connection between R25 and R1. This needs to be a 13-roll, but when starting they only play the 4th repetition. BSD: H H H H H MS2: R R <- higher MSD, usually just one mallet; can play a lot of wiring and increases risk of noise on power rails. Things best left to external modules: CV-controlled CV offset module - add a switch of some sort.

New Pull Request