3
1
Back

8 2.5mm vertical SMD spring clamp terminal block RND 205-00012 pitch 5mm size 10x12.6mm^2 drill 1.3mm pad 2.6mm Terminal Block WAGO 236-212 45Degree pitch 5mm size 40x9mm^2 drill 1.3mm pad 2.6mm Terminal Block Phoenix MKDS-3-10-5.08 pitch 5.08mm size 15.2x8.45mm^2 drill 1.1mm pad 2.1mm Terminal Block TE 282834-9 pitch 2.54mm size 25.9x6.2mm^2 drill 1.1mm pad 2.2mm Terminal Block WAGO 236-104, 45Degree (cable under 45degree), 8 pins, pitch 10mm, size 62.3x14mm^2, drill diamater 1.15mm, pad diameter 2.4mm, outer diameter 1.7mm, outer diameter 1mm, size source Multi-Contact FLEXI-E 1.5 (https://ec.staubli.com/AcroFiles/Catalogues/TM_Cab-Main-11014119_(en)_hi.pdf), bend radius 3 times outer diameter, generated with kicad-footprint-generator Fuse SMD 0603 (1608 Metric), square (rectangular) end terminal, IPC_7351 nominal with elongated pad for handsoldering. (Body size from: http://datasheets.avx.com/NOS.pdf), generated.

New Pull Request