3
1
Back

See http://cdn-reichelt.de/documents/datenblatt/C151/RND_205-00276_DB_EN.pdf, script-generated with , script-generated using https://github.com/pointhi/kicad-footprint-generator/scripts/TerminalBlock_MetzConnect THT terminal block Metz Connect Type059_RT06306HBWC pitch 3.5mm size 53.2x7mm^2 drill 1.2mm pad 3mm Terminal Block WAGO 236-308 45Degree pitch 5mm size 46.5x15mm^2 drill 1.2mm pad 3mm Terminal Block 4Ucon ItemNo. 10688 pitch 3.5mm size 49.7x7mm^2 drill 1.2mm pad 3mm Terminal Block Phoenix MKDS-3-7-5.08, 7 pins, pitch 10mm, size 45x10.3mm^2, drill diamater 1.3mm, pad diameter 2.6mm, see http://www.mouser.com/ds/2/324/ItemDetail_1935161-922578.pdf, script-generated using https://github.com/pointhi/kicad-footprint-generator/scripts/TerminalBlock_WAGO THT Terminal Block WAGO 236-624 45Degree pitch 7.5mm size 37.5x11mm^2 drill 1.4mm pad 2.6mm Terminal Block Phoenix MKDS-3-11-5.08, 11 pins, pitch 10mm, size 25.8x8.2mm^2, drill diamater 1.15mm, pad diameter 2.6mm, see http://www.farnell.com/datasheets/2138224.pdf, script-generated using https://github.com/pointhi/kicad-footprint-generator/scripts/TerminalBlock_RND THT terminal block RND 205-00246, 7 pins, pitch 10.2mm, size 66x8.3mm^2, drill diamater 1.3mm, pad diameter 2.6mm, see http://www.metz-connect.com/de/system/files/productfiles/Datenblatt_310671_RT019xxHDWC_OFF-023605N.pdf, script-generated using https://github.com/pointhi/kicad-footprint-generator/scripts/TerminalBlock_Phoenix THT Terminal Block WAGO 236-114 45Degree pitch 5mm size 10x10.5mm^2 drill 1.4mm pad 2.6mm Terminal Block WAGO 804-316 45Degree pitch 7.5mm Varistor, diameter 15.5mm, width 3.9mm, pitch 7.5mm size 45x9mm^2 drill 1.3mm pad 2.6mm Terminal Block Phoenix PT-1,5-3-3.5-H pitch 3.5mm size 29x8.3mm^2 drill 1.3mm pad 2.5mm terminal block RND 205-00301 pitch 10mm size 242x14mm^2 drill 1.15mm pad 3mm Terminal Block WAGO 236-103 45Degree pitch 7.5mm size 69.8x14mm^2 drill 1.15mm pad 3mm Terminal Block TE 282834-5 pitch 2.54mm DCDC-Converter, RECOM, RECOM_R5xxxDA, SIP-12, Horizontally Mounted, pitch 2.54mm, drill diameter 0.8mm Test point with 2 copper strips net tie solder jumper bridged SMD Solder Jumper, 1x1.5mm rounded Pads, 0.3mm gap, open SMD Solder 3-pad Jumper, 1x1.5mm Pads, 0.3mm gap, pads 1-2 Bridged2Bar with 2 copper strip, labeled with numbers SMD Solder Jumper, 1x1.5mm Pads, 0.3mm gap, open, labeled with numbers SMD Solder 3-pad Jumper, 1x1.5mm rounded Pads, 0.3mm gap, open, labeled with numbers SMD Solder Jumper, 1x1.5mm Pads, 0.3mm gap, open, labeled with numbers SMD Solder Jumper, 1x1.5mm Pads, 0.3mm gap, open SMD Solder Jumper.

New Pull Request