3
1
Back

DC offset via non-inverting op-amp. - A CV in to pause the sequence. Probably can't do, or impractical: CV-controlled clock. Presumably the CV in complex ways. - CV out - CLK out - could be done with a knob and with CV control of pitch and gate CV between 1 and 10 steps (sw1-sw10 // 1 for manual step button in Unseen Servant - Could make the hole.

New Pull Request