Labels Milestones
BackEdge cut? Corrected in Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on repique/caixa, two or three for surdos
Edge cut? Corrected in Rev 2.0 alpha 1: Properly assign potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on repique/caixa, two or three for surdos
row_2.
New Pull Request