3
1
Back

2p6t, which means only six different step counts are available until the replacement arrives - Wiring SW15 (once/stop) and cascade out is easier done via skywiring; only one cross-board wire is needed, vs 3 if the Program is not available, but a much bigger circuit. Haven't found a simple implementation. Can be done, but requires a lot of wiring and increases risk of noise on power rails. Things best left to external modules: - CV-controlled CV offset module - add a switch to adjust parameters for. 1.0 2012-03-?? Initial release.

New Pull Request