3
1
Back

Pads and trace routing to de-bodge the pots. Updates the potentiometer shaft clf_indicator_angle_from_notch = 0; right_rib_x = width_mm - h_margin; cv_in = [input_column, bottom_row, 0]; c_tune = [second_col, first_row, 0]; c_tune = [width_mm/2 + h_margin, top_row, 0]; f_tune = [second_col, second_row, 0]; //Third row interface placement sync_in = [first_col, fifth_row, 0]; square_out = [output_column, bottom_row, 0]; pwm_duty = [width_mm - h_margin - working_width/8, row_4, 0]; left_rib_x = hole_dist_side + thickness; col_left = h_margin; col_middle = col_left + (15.6 + 1.5 + 7 + 8); // pot + led + switch? Col_right = width_mm - right_rib_thickness; // projection: make a hole for mounting screw: ISO 1481-ST 2.2x4.5 C (http://www.fasteners.eu/standards/ISO/7049/) || order number: 1924619 16A (HC Generic Phoenix Contact connector footprint for: MC_1,5/2-GF-3.5; number of pins: 09; pin pitch: 5.08mm; Vertical; threaded flange || order number: 1843253 8A 160V Generic Phoenix Contact.

New Pull Request