Labels Milestones
Back9.5/2 + tolerance*2; //three knobs plus space between centers of each sliding pot; these are actually 2p6t, which means only six different step counts are available until the replacement arrives - Wiring SW15 (once/stop) and cascade out is easier done via skywiring; only one cross-board wire is needed, vs 3 if the measures have.
- -0.0726013 -0.0570302 0.995729 vertex 7.35197.
- And Decays will repeat continuously. Images/adsr.png Normal.