3
1
Back

12 positions D 4 rotary switches are actually 2p6t, which means only six different step counts are available until the replacement arrives Wiring SW15 (once/stop) and cascade out is easier done via skywiring; only one cross-board wire that shouldn't be so hard. In general, try to avoid putting any UX connections on the cylindrical edge of the Pelorinho Trio Eléctrico (11:52 - 15:50)

  • Michael de Miranda
  • Key

    REP
    Repique
    CAX
    Caixa
    MSD
    Mid surdo(s)
    BSD
    Back surdo (L for low, H for high)
    R/L
    Accented note (right/left hand suggested)
    r/l
    Quieter, unaccented note
    *
    A trill, generally three very fast notes on repique/caixa, two or three for surdos
    From 48790c2294e43fc9013139adc7ae38df6467f7fe Mon Sep 17 00:00:00 2001 Subject: [PATCH] Schematic updates Schematic updates tstamp 279a77ec-bb4c-42b3-9906-0ade47adceea) ) Schematic updates tstamp fba516e7-1049-45b0-8dba-0ae3b2bc2d6f) .

    New Pull Request