3
1
Back

The potentiometer pads and trace routing to de-bodge the pots. Updates the potentiometer pads and trace routing to de-bodge the pots. D5bfb6e27b 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV lines? UI: 3 5mm LEDs -Consider: 1 simple on/off switch/button/knob/etc. (attr (teardrop (type padvia (min_thickness 0.0254) (filled_areas_thickness no From 32ded0979b3a28a6950eb6a371cc2ef88606b4ff Mon.

New Pull Request