3
1
Back

Ignored # KiCad backups folders *-backups # Compressed files *.zip # Mac stuff *.DS_Store # Emacs temps *~ \#* # LTSpice Simulations/*.log Simulations/*.raw Simulations/*.txt Copper Layer Stackup: ============================================================= L1 : F.Cu front L2 : B.Cu back Drill file 'precadsr-panel.drl' contains T1 3.200mm 0.1260" (4 holes) (with 4 slots) T2 5.000mm 0.1969" (1 hole) Total plated holes Total unplated holes count 0 Minor layout tweaks Finish schematic, add PDF | J6 | 1 | B10k | \*\*Potentiometer, 16 mm vertical board mount | | | C1, C11 | 2 pin Molex connector 2.54 mm spacing KK254 Molex connector 2 pin Molex connector 2.54 mm spacing 2 pin Molex connector 2.54 mm spacing D 3 rotary switches are actually 2p6t, which means only six different step counts are available until the replacement arrives Wiring SW15 (once/stop) and cascade out is easier done via skywiring; only one side //calculated x value of exact middle of slider panel (between steps 5 and 6); middle of panel after deducting left/right sub-panels slider_center = (width_mm - left_panel_width.

New Pull Request