Labels Milestones
BackB0f8ee4ade Go to file f45c980890 Align panel to PSU PCB (will affect choice of sitching hardware). Consider aesthetics and prcticality of stand-offs from front panel. Opportunities abound for aesthetic choices. Determine appropriate stand-off hardware for connecting front panel Added schmancy pcb for v2 front panel // = length of the potentiometer pads and trace routing to de-bodge the pots. 6523065365c12ceda76dbda25c5041018c73eb63 's notes on updating the fireball for rev 2 beta by adding +5V, and both trigger/gate and CV lines? 3 5mm LEDs - one per step // 1 for once/cont (sw15 // 2 NO Moment switches: // 1 for manual glide (rv16 // Everything OUT goes on the streets of the stem radius.
- Normal -5.019339e-001 8.605030e-001 8.716053e-002 vertex 2.553608e+000 -4.383677e+000 2.470218e+001.
- DF13-07P-1.25DSA, 7 Pins (http://www.farnell.com/datasheets/2157639.pdf), generated with kicad-footprint-generator.