3
1
Back

2x Sockets, all three pins need wires: - clk in - CV out Latest commits for branch corrected_silkscreen updated README.md 2cb8e5eaf679e30139948d8744800b04487466fc updated C5 footprint & tracing; schematic annotation updates the potentiometer pads and trace routing to de-bodge the pots. Updates the potentiometer pads (i.e. Make the bodging of the rail + a safety margin // margins from edges v_margin = hole_dist_top*2; width_mm = hp_mm(width); // where to put reinforcing walls.

New Pull Request