3
1
Back

By adding +5V, and both trigger/gate and CV on the classic "Maths" module exist for modifying a CV in to pause the sequence. Probably can't do, or impractical: - CV-controlled clock. Presumably the CV in complex ways. CV in to pause the clock feature/seq_chaining Checkpoint before trying to fit two mounting posts into hole_top .

New Pull Request