3
1
Back

This note Variations MSD: L* L* -> only second half of the entire pot. State Gates (from Befaco) * TBD, needs testing; but if LEDs are possible, this should be changed to IDC 2×6 connectors. - If we expect or plan on developing.

New Pull Request